Step-by-Step Timeline for Roof and Solar Panel Work

Full Timeline for Roof and Solar Panel Projects in Florida

Introduction

If you have a solar panel system installed on your roof and need to replace the roofing system, the process involves much more than a simple panel removal. Coordinating a roof and solar panel project requires proper permits, safety inspections, and licensed technicians. By understanding the full timeline, you’ll be able to set realistic expectations and protect both your roof and your renewable energy investment.


Step 1: Permit and HOA Approval

Before any roof and solar panel work begins, your contractor must secure a building permit and HOA approval if applicable.

  • Permit Time: Usually 5 business days
  • HOA Review: May take up to 30 days depending on your community

These steps are mandatory to ensure your project complies with local laws and neighborhood regulations.

Step 2: Scheduling and Solar Panel Removal

  • Time Required: 1 full day
  • Important Notes: Panels should only be removed by certified solar professionals. The system is inspected before and after removal to verify safety and functionality.

The components are then stored safely—often in a garage or shaded area—until the new roof is complete.

Step 3: Roofing Work Begins

  • Roof Delivery: Typically scheduled the day after removal
  • Installation Time:
    • Standard roofs (20 squares or fewer): 1 day
    • Larger or complex roofs: 2+ days

If you plan to upgrade your roof and solar panel system—such as installing better racking or battery storage—this is the time to plan ahead.

Step 4: Post-Roof Inspection

  • This inspection ensures your new roof complies with local building codes
  • Solar reinstallation cannot begin until this step is passed

Step 5: Solar Panel Reinstallation

  • Time Required: 1 full day
  • What Happens: Panels are remounted, rewired, tested, and reconnected to the inverter and grid. Any upgrades requested are completed at this time.

Why the Process Takes Time

A complete roof and solar panel project typically spans 7 to 30+ days due to the coordination of multiple factors:

  • Permit applications
  • HOA approvals
  • Solar and roofing team schedules
  • City inspections

While this may seem long, following these steps ensures you maintain your system warranty, meet code, and avoid future issues.

Frequently Asked Questions

How long does the entire process take?

Generally, 7–30 days depending on HOA approval, permits, contractor scheduling, and inspection timelines.

Do I need a permit to remove and reinstall solar panels?

Yes, a permit is required to stay compliant and protect your system warranty.

Will I have power during the project?

You’ll temporarily use grid electricity. Once your system is reconnected, solar production resumes.

Is this a good time to upgrade my system?

Absolutely. Consider inverter upgrades, battery installation, or layout improvements during the downtime.

Who should I hire?

Always hire certified professionals for your roof and solar panel project. This ensures warranty protection, electrical safety, and code compliance. Learn more about maintenance from the U.S. Department of Energy’s solar guide.


Need Help With Your Roof and Solar Panel Project?

We specialize in handling every step—permits, HOA approvals, roof replacement, and certified solar panel reinstallation. With licensed technicians and a strong reputation across Florida, we make the process seamless and warranty-compliant.

Click here to get a personalized estimate for your roof and solar panel project.

FREE Expert removal / Reinstall quote

Leave a Reply

Your email address will not be published. Required fields are marked *